Our work / Public waterfronts

MOGADORE RESERVOIR · OHIO

A place to cast.
A connection to the water.

A floating fishing pier for the State of Ohio, built by American Muscle Docks and installed by AquaLife Construction.

See the installation
PROJECT
Public floating fishing pier
BUILT BY
American Muscle Docks
INSTALLED BY
AquaLife Construction
FOR
State of Ohio

A PUBLIC CONNECTION

From the bank
to the fishing platform.

A long gangway connects the shoreline to a broad floating platform, with railings following the route over the water.

AquaLife’s role was the installation. These project photos document the equipment, shoreline work area and connections that brought the American Muscle Docks pier into place.

INSTALLATION AT THE RESERVOIR

Bringing the pieces
to the water.

From staging the gangway on shore to working beside the platform, the photographs follow the installation as it took shape.

01 · The gangway staged on shore
02 · Crane equipment at the water’s edge
03 · Installation from the shoreline
The gangway connection during installation

THE SHORE CONNECTION

One route,
out over the water.

The gangway links the bank with the railed floating platform. The finished layout extends the fishing area out from the shoreline while keeping the route back to land clearly defined.

Open any image to browse all seven project photos, including work beside the platform.

PARKS · COMMUNITIES · PUBLIC WATERFRONTS

Plan your next
waterfront connection.

Tell us about your site and the access you want to create.

AquaLife Waterfront Guide

A little guidance.
More time on the water.

Explore dock and pond ideas, compare ports, or find parts and pricing at AquaLife Dock Shop.

This is an AI guide. Starting chat connects you to SiteGPT, which processes your messages and any details you choose to share. Our team confirms fit, pricing and project details. Privacy details

Or talk with the AquaLife team